It is Mawarid’s underground copper project with 6.4 million tons of reserve at a grade of 2.04%.
شركة مناجم هي مشروعٌ مشترك تأسّس بين شركة موارد للتعدين ذ.م.م وشركة تنمية معادن عُمان (مـ.د.ع)، بنسبة ملكية تبلغ ٦٠٪ و٤٠٪ على التوالي.
Manajem is currently in the licensing stage. The company plans to focus on its exploration activities within Block 11B, previously named Block 1 & 2, located in North Al Batinah. The targeted area covers approximately 541.5 km² and is primarily a copper exploration project.
The concession area is located in Umm As Sameem, within the Dhahirah Governorate, specifically Block 53B.
A special-purpose vehicle established under Mawarid Mining, called Mawarid Mining Potash LLC, is leading the development.
The projects are currently in the early stages, focused on exploration and fieldwork studies.
Phosphate is considered by the United Nations as a critical element for food security.
Phosphate deposits contain phosphorus, which is a vital element for growth in plants, animals, and humans. There is no artificial substitute for phosphorous for this purpose. It is therefore an essential element used in the production of fertiliser and animal feed to promote and sustain health and growth.
Phosphate is therefore now considered and listed as a critical mineral for food security by an increasing number of nations, including Canada, New Zealand, and Australia, as well as organizations such as the United Nations.
More recently, phosphate has proven to have significant technical and environmental benefits if used as an alternative to highly toxic metals such as cobalt to produce lithium ferro phosphate batteries in the green energy and electric vehicle sectors.
The Sandpiper Project is a pelletal-phosphorite resource on the continental shelf off the west coast of Namibia, in the Atlantic Ocean, in water depths of 180-250m. Previous exploration activities have verified, to internationally approved standards, the existence of a world-class economically viable marine phosphate resource. The Mining License (ML170), covering an area of 2,334 km2, was granted in June 2011 for an initial period of 20 years. The mineral resource and ore reserve base, which is JORC Compliant, is of a size and average grade capable of supporting the development of a long term economically viable mining operation.
The application for environmental permitting has been submitted and is currently pending. Required public consultation and project awareness activities have been conducted since 2011 and are ongoing.
Ore Reserves: Proven and Probable Ore Reserves of 132.76 Mt at 20.41% P2O5
Mineral Resources:
Cut-off Grade: Ore Reserves and Mineral Resources were estimated at 15% cut-off grade
NMP is a Namibian registered joint venture (JV) company, which is 85% owned by a Namibian-registered and wholly-owned subsidiary of Oman-based Mawarid Mining LLC, and 15% owned by a 100% Namibian-owned company, Havana Investments (Pty) Ltd.
Namibians and the National Economy will benefit on a number of levels, including but not limited to:
As the phosphate industry in Namibia matures, there is potential to establish future downstream processing of rock phosphate concentrate utilizing higher skilled industrial processing facilities to produce higher value fertilizer products not only for export but also to help secure agricultural productivity and food security in Namibia and the region.
The project will contribute to local, regional, and national growth through employment, royalties, and tax revenues. Direct permanent employment will be created, as well as indirect jobs in supporting services. These will include short-term employment during construction and the opportunity for capacity development and training.
The proposed development of the current identified Ore Reserves will support an initial 20-year mine plan with an annual recovery of approx. 5.5 Mt per annum. At these levels of production, the defined phosphate mineral resources are adequate to support sustainable mining at the proposed rates for several generations, potentially extending up to 100+ years.
It is envisaged that the mining operation will entail dredging and recovery of marine phosphate bearing sediments using a Trailing Suction Hopper Dredger (TSHD) from water depths between 200 to 250m, within ML170. The scale of the proposed project will involve mining of up to approx. 2.5 km2 per annum (average of 1.7 km2 per year over 20 years), which equates to approx. 0.1% of the mining license area and 0.002% of seabed on the continental shelf within Namibia’s exclusive economic zone.
The cumulative impact footprint of dredging will cover an area of approx. 34 km2 area over the 20-year life of phosphate dredging, which represents approx. 1.5% of the mining license area and 0.03% of the seabed on the continental shelf within Namibia’s exclusive economic zone. The infographic below depicts the area to be mined annually in comparison to diamond mining and the fishing industries, which are already present in the Atlantic Ocean.
The process of mining sediments on the seafloor will be carried out utilizing a conventional Trailing Suction Hopper Dredger (TSHD) dredging process. The recovery of material from the seabed in the shallow waters on the continental shelf for marine mining purposes is done by some method of dredging to excavate the seabed sediment and deliver the dredged sediment to the surface for processing. Namibia already has a well-established mineral and environmental legislative framework, along with additional pending management measures, including Marine Spatial Planning and a Blue Economy Policy, to ensure that a vibrant marine mining industry is maintained in balance with other ocean-based industries and activities.
During the dredging process, the very fine component of the seabed material remains in suspension and is discharged with excess water from the dredger. This process generates what is known as a fine sediment plume, which is a common feature for most surface-driven dredging operations. The dispersion of the fine sediment plume has been comprehensively modelled and assessed by specialists as part of the Environmental and Social Impact Assessment (ESIA) process. The study concludes that the plume will disperse largely within the boundaries of the Mining License area and is expected to have a low-to-moderate impact on the local marine environment. Additionally, as part of the ESIA process, appropriate verification, baseline, and monitoring programmes have been included in the final Environmental Management Plan (EMP) for the project.
Plume dispersion, water column chemistry, and toxicity specialist studies have all been conducted to date as part of the Sandpiper Project’s comprehensive environmental impact assessments. These expert studies have concluded that there will be no significant impact on the Benguela marine ecosystem or the commercial fishing industry as a whole as a result of the dredging operations and disposal of fine sediments overboard. The seabed in the mining area will be excavated to a depth of 2.5m on average; however, the Sandpiper Project’s environmental management plan (EMP) requires that the base layer (below the phosphate zone) is not exposed and that corridors of undisturbed seabed are left within the mining area to support recolonization of the seabed benthos as part of the rehabilitation process. As the dredging process in the mining area is not continuous and will take place only approx. 3 times a week (i.e. not 24/7 as in the marine diamond mining industry), the generated sediment plume will therefore have time to disperse in between dredging cycles, thereby substantially reducing the overall impact on the marine environment.
Yes. The Environmental Clearance Certificate (ECC) application process itself has been rigorously evaluated and faced challenges similar to what the Uranium Industry underwent when being developed in Namibia.
Most recently, NMP has completed and submitted a comprehensive Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP) in October 2022 as part of the application for the Environmental Clearance Certificate for Mining License ML170. Prior to that, NMP has, since 2011, been conducting Environmental Impact Assessments and Specialist Studies. These reports are publicly available from the Ministry of Environment and Tourism (MET). Additionally, the ESIA and Specialist studies have been subjected to an independent external review on 4 occasions, including the most recent in 2023 by consultants appointed by the Environmental Commissioner.
The ESIA, the supporting independent expert reports, and the external reviewers’ reports all collectively conclude that the Sandpiper Project will not have a significant impact on the Benguela current large marine ecosystem, marine environment, or the commercial fishing industry in Namibia.
None of the independent expert reports completed to date advised against the proposed phosphate dredging operations. In fact, all reports concluded that the Sandpiper Project will not have a significant impact on Namibia’s marine environment or the Benguela Large Marine Ecosystem, and the reports also refuted the unsupported claims and related public concerns that phosphate mining will cause “catastrophic damage to the environment” or “kill the fishing industry.”
How many specialist studies were conducted during the EIA Process? 28 specialist reports have been completed, assessing various aspects of the potential environmental impact of the proposed dredging operations in ML170.
* These are available either on NMP’s website or at the Ministry of Environment and Tourism.
Yes. Localised and regional studies confirm that marine phosphate mining operations can co-exist with fishing (and other related marine-based industries) just as fishing already co-exists with, for example, the existing marine diamond mining operations in Namibia. Published evidence from these independent expert reports conclude that the Sandpiper Project will not “kill the fishing industry,” as claimed in some media reports. The marine diamond mining industry has co-existed with the fishing industry in Namibia for over 30 years, and repeated environmental studies (conducted by Namibia’s leading marine diamond mining company, NamDeb, over the past 30 years) have produced strong evidence that the seabed does recover after dredging excavation for marine diamond recovery (source: the 2008 BCLME study on cumulative impacts of seabed mining in Namibia by Pisces Environmental Consultant).
Since it has been proven that marine diamond mining operations have not affected the fishing industry, then marine phosphate mining, which will be undertaken at a much smaller scale than marine diamond mining, will also be able to co-exist with the fishing industry.
No. NMP’s mining activity (based on 1 vessel) will affect an area of up to 2.5km2 of the seabed per year (an average of 1.7 km2 per year over 20 years). Comparatively, every year, in Namibia, the diamond mining fleet of 7 vessels affects an estimated area of at least 10-15km2 per year while commercial fishing bottom trawling fisheries affects an estimated area of over 18,000 km2 per year.
The cumulative impact footprint of NMP’s operations will cover an area of approx. 34km2 over the 20-year life of phosphate mining. By comparison, the cumulative area of seabed excavated by Debmarine Namibia’s diamond mining operations over the past 25 years, since commencement in early 2000s, is reportedly estimated to be about 3% of their 6000 km2 mining license area (ie. 180 km2) (source: Resource development – Operations | Debmarine Namibia).
There is conclusive evidence confirming that the seabed does recover after excavation at varying rates depending on water depth, according to repetitive environmental surveys conducted by NamDeb over 30 years of marine diamond mining extracting sediments from the seabed (source: the 2008 BCLME study by Pisces Environmental Consultant).
Yes. The sediment dredged from the seabed will be stored in the hopper of the dredge vessel and transported to a shore-based plant for processing to produce a phosphate concentrate product. During the onshore processing, all the process tailings, including the residual fine and coarse sediment (shell) fractions that do not form part of the phosphate concentrate product, will be transported by pipes and stored in a suitable Tailings Storage Facility (TSF). None of the residual tailing’s material from the processing plant will be discharged into the ocean.
The processing for beneficiation of the marine phosphate ore to produce phosphate concentrate is a mechanical process carried out utilizing sea water, mechanical spirals, and size screening equipment that remove both coarse and fine particles. No toxic or potentially hazardous industrial chemicals are utilized to produce the phosphate concentrate product for the Sandpiper Project.
Since independence in 1990, Namibia has developed Environmental Legislation that provides the regulatory framework within which major industrial operations have been operating successfully for the past 35 years both onshore as well as offshore, for example, with the marine diamond mining industry.
Excellent Regulations: Namibia has excellent regulations regarding waste management and monitors production plants across various industries including, but not limited to, marine diamond mining, uranium processing, etc. In fact, Namibian environmental legislation ranks amongst the best in the world and has been effectively applied by the Government since independence in 1990 under the jurisdiction of the Ministry of Environment and Tourism (MET).
The Rocky Point Project if focussed on the exploration of a localised pelletal-phosphorite resource which is contained within the unconsolidated seafloor sediments on the continental shelf off the west coast of Namibia, in the Atlantic Ocean, in water depths of 180-250m. These deposits were identified and mapped in regional marine geological surveys and studies carried out in the mid-1970’s to mid-1980’s by the Joint Geological Survey of South Africa and University of Cape Town Marine Geoscience Unit.
The Rocky Point Project is held in a Namibian registered company, Mawarid Mining Tungeni Joint Venture (Pty) Ltd in which Mawarid Mining (Namibia) (Pty) Ltd (a Subsidiary of Mawarid Mining LLC) owns 70% and 30% is owned by Tungeni Investments CC, a local Namibian entity.
The Rocky Point project is located offshore on the continental shelf to the north of Walvis Bay, Namibia in water depths of 100-250m. The project covers an area of 4000 km2 and comprises 3 issued Exclusive Exploration Licenses (EPL’s) and one EPL application (pending, covering a previously held EPL).
Mawarid Mining LLC currently provides 100% of the funding for the administration and exploration activities in the Rocky Point Project.
Exploration activities in the Rocky Point Project are managed and conducted by Namibian Marine Phosphate (Pty) Ltd. Activities in the project area to date have been directed to identify prospective high concentration targets for detailed sampling to delineate and assess potential economically viable resources. Sampling completed in 2011 identified 3 target areas of phosphate concentration for follow up investigation. In 2012, follow-up sampling was completed in 2 of the target areas.
Results from this program further defined the zones of phosphate concentration along with initial characterisation of deposit grade and thickness.
Exploration activities have been suspended from 2014 to date pending renewal of the EPL’s and issuing of new environmental clearance certificates.
Going forward, once matters are resolved, the planned work program will be resumed and will include sample analysis and additional sampling in selected prospective targets for resource delineation and classification purposes.
The NIU Solwara Project is a deep-sea polymetallic deposit, containing copper and gold, found within a seafloor massive sulfide (SMS) formation. The site is located in the Bismarck Sea at water depths of up to 1,700 meters below sea level.
The project is fully permitted with granted licences all in good standing.
SMS is a joint venture between Deep Sea Mining Finance Limited (DSMF) and SM2 Limited (SM2). DSMF is owned by a group of international investors with substantial experience in exploration, mining, and deep-water projects.
DSMF acquired the assets and key subsidiaries of the Nautilus Group in a transparent process known as Companies Creditors Arrangement Act, approved by the Courts of Canada, B.C., in 2019.
This included the acquisition of Nautilus Mineral Niuguini Limited, which holds the current Mining Licence and Environmental Permit.
SM2 is a partner of DSMF, who acquired their interest through the successful completion of 2 phases of work under a Farm-In Agreement.
SM2, through its affiliate Magellan Limited, is a highly reputable operator in offshore contracting and geotechnical survey capabilities, with thousands of hours of experience in deep- and ultra-deep ROV operations, including environmental and site investigations.
The Government of Papua New Guinea (PNG) has both a direct and indirect involvement:
The Government of PNG’s 15% interest is protected; any required funding will come from SMS. The Government of PNG has no obligation to allocate additional funding, and will benefit from the NIU Solwara Project profits, mining royalties, and tax revenues (PAYE, corporate, etc,) in the future.
The successful realization of the NIU Solwara Project will generate employment (direct and indirect), training courses, community projects under the Community Social Responsibility plan, and new business development opportunities in PNG.
The state-owned entity, Eda Kopa will receive 15% of profit share through the joint venture agreement with Nautilus Mineral Niuguini Limited (now Sustainable Mining Solutions (SMS)).
As outlined in the Mining Licence Applications for ML154, a Memorandum of Agreement is currently being negotiated between SMS and the “State PNG” as to how the Mining Royalty will be shared at both Central and Local Government levels.
SMS has executed two (2) Memorandums of Understanding (MOUs) with:
The MOUs set out SMS’s commitment to Community Social Responsibility (CSR) projects that directly benefit the local communities, such as building bridges and assisting with health care and education.
SMS’s CSR commitment towards Health and Hygiene, Education, and Infrastructure directly to Coastal Area of Benefit (CAB) communities is in excess of PGK13.0 million.
Per the NIU Solwara Mining Licence, several plans have been submitted, which include:
In addition, the direct benefits for the population will be employment, training, taxes, and development of SMEs to support project requirements.
All activities were permitted, as confirmed by the Mineral Resources Authority (MRA) in Papua New Guinea (PNG).
Activities:
Sustainable Mining Solutions (SMS) carried out the following activities:
Permissions:
All activities carried out were permitted under Papua New Guinea’s regulatory requirements.
The MRA approved the bulk sampling program, which was conducted under SMS’s existing Exploration Licence (EL1196), for which SMS was required to submit the following documents:
The activities in PNG’s waters were fully disclosed in accordance with the regulatory requirements and received approval from all relevant Regulatory Authorities.
Yes, from the initial analysis of the activities, data, and findings to date, the program did meet Sustainable Mining Solutions (SMS)’s expectations.
Excavation Grab design
To prevent accidental discharge of hydraulic oil into the environment, the grab was designed to be powered from seawater. This was a novel design, and critical findings will be incorporated into the commercial Excavation Grab design.
Any marine activities, including those of Sustainable Mining Solutions (SMS) at NIU Solwara, will impact the marine environment.
Under Papua New Guinea law, the allowable impacts of mining at NIU Solwara are regulated, managed, and conducted in accordance with the Mining Law and Environmental Act (2000) with activities being monitored under the conditions of SMS’s granted Environmental Permit (EP).
Monitoring and Reporting requirements for the approved activities are carried out in compliance with the approved NIU Solwara Environmental Management and Monitoring Plan (EMMP), which is a condition of the EP.
All mining activities will have an impact on the marine environment and SMS is working with internationally respected Environmental Consultants to ensure the impacts from SMS’s mining will have a low impact on the marine environment.
Sustainable Mining Solutions (SMS) holds a valid Environmental Permit EP-L3 (234) (granted 29th December 2009) to carry out Level 3 mining activities within the NIU Solwara Mining Licence area (ML154) for a period of 25 years.
The key bodies of work, all of which have been lodged and approved by Conservation Environment Protection Agency (CEPA), set out the background work that underpins SMS’s environmental requirements and supports the EP conditions and obligations:
Compliance and Reporting
In addition, a key condition of the EP is that an Environmental Management and Monitoring Plan (EMMP) be submitted and approved by CEPA 3 months prior to commissioning the project’s commercial operations.
In accordance with the conditions set out in the EP, a draft EMMP was submitted to CEPA in June 2017. In 2018, CEPA engaged an independent consultant (Hydrobiology) to review the EMMP. Findings from the Bulk Sampling program (May-July 2024), together with the independent report, agreed recommendations will be incorporated into the final draft EMMP for approval. Environmental monitoring will be undertaken and reported at agreed intervals during operations to ensure compliance with the approved EP.
Previous modelling indicates that the plumes generated by the mining activities will not exceed 1,300 meters from surface in the water column and will adhere to water quality targets beyond the proposed Mixing Zone Boundary (MZB).
Primary commercial fisheries in Papua New Guinea target tuna and crustaceans (e.g. prawn, lobster, etc.), which live at depths unaffected by the seabed-mining activities.
In addition, commercial fishing areas are well away from NIU Solwara.
Sustainable Mining Solutions proposed mining activities will not adversely affect commercial fishing of tuna.
Sustainable Mining Solutions (SMS) plans to mine active hydrothermal vents, however the mining activities will not adversely affect the marine life habitat.
Mining will be restricted near active hydrothermal vents, given fluid temperatures at active hydrothermal vents can reach up to 300 Celsius or more and will raise the risk of equipment damage. However, in areas where mining is undertaken, studies show that venting of fluids will continue at new or existing locations, and new chimney structures will start to reform in a very short timeframe. Evidence has shown that the chimneys, created by the hydrothermal vents, can grow as fast as 30cm per day.
Studies also show recolonisation rates are faster at active vent and active sedimentary sites due to the higher temperatures.
With SMS’s recolonisation measures in place, it is anticipated that after a period of 1 to 3 years, populations at active sulfide mounds will resemble the pre-mining condition of biomass and diversity.
SMS is committed to full compliance with all environmental standards as required under the Environmental Permit.
NIU Solwara is a relatively small deposit and the construction of a local processing plant in New Ireland is currently not economically viable. Once operations are established and Sustainable Mining Solutions explores and develops further deposits within Papua New Guinea, if the volumes of ore allow, then the possible development of a local processing plant will be revisited.
Even so, options to feed the NIU Solwara ore into existing operations in Papua New Guinea as an augmented feed is being considered.
The world needs copper. Compared to terrestrial mining, deep-sea mining offers a reliable source with a significantly lower environmental impact.
Deep-sea mining mitigates several major environmental hazards and impacts associated with terrestrial mining and diminishing copper grades, such as:
Extensive scientific studies have enabled SMS to assess the risks to marine ecosystems and carefully weigh them against the damage caused by terrestrial mining. The benefits of Deep-Sea Mining in addressing global climate challenges and pathway to “Net Zero” is clear.
No. Whereas riverine tailings disposal and deep-sea tailings disposal of mine waste is an established practice in Papua New Guinea, the activities of SMS in the Bismack Sea do not create any tailings as all the ore is sent for processing.
Mawarid is focused on exploration for 3T minerals: Tin (Sn), Tungsten (W) and Tantalum (Ta).
Early-stage exploration and follow-up of identified 3T targets.
Yes, the project area has a long history of artisanal mining for 3T minerals since the early 1930’s. There are many remnants artisanal workings.
The project spans three exploration concession licenses covering approximately 8,495 hectares. We are also awaiting the granting of Large-Scale Mining Licenses under Rwanda’s mining law.
The project is owned 100% by Mawarid Mining LLC under its subsidiary Tri Metals Mining Rwanda Limited, a company registered and incorporated under the laws of the Republic of Rwanda.
Mineralization is developed at surface and extends to ~200m in early-stage targets. Pegmatite bodies and veins can extend even deeper.
The company will adhere to the Organization for Economic Co-operation and Development (OECD) Due Diligence Guidance for 3T minerals and reports under national laws and systems in place.
Yes, baseline Environmental Management Plan (EMP) is in place and further Environment Sustainability Impact Assessment (ESIA) studies will be conducted upon the grant of Large scale mining licenses, and community engagements have been ongoing in line with the relevant Rwandan laws.
Yes, the company is working on co-existence strategies.
Yes. A pilot plant is under design for small-scale concentration tests.
Rwanda has a few smelters and several 3T concentrate exporters. Long-term smelter partnerships will be discussed in the future.
Most sites are within 5-6 hours of Kigali, with 4 hours good road access until Kibuye then 1 hour dirt road to field camp which is accessible by 4WD only.
Proximity to water sources, rural electrification and accessible dirt roads. Rwanda has efficient logistics and export channels.
Yes, the wet season (March–May & October–November) affects site access. Drilling is typically undertaken in the dry season.
Teams operate under strict Health, Safety and Environment (HSE) protocols in line with Rwanda’s mine health & safety standards and company Environmental, Social and Governance (ESG) policy.